Head of drinking water in the Red Sea: Replacement and renovation of water networks in areas of hope and fishermen

Eng. Yahya Siddiq, Chairman of the Water and Sanitation Company in Red Sea Governorate, confirmed that the work of replacement and renovation of water networks in each of the areas of hope and fishermen in the governorate has been completed.
He pointed out that the company is implementing a number of replacement and renovation of some water networks in several areas, where the old lines are replaced by lines "upvc"New, conforming to the standard specifications to improve water quantities and to ensure the quality of drinking water pumped to citizens.
The head of the company explained that the total cost of replacement and renovation of the water network in the hope area amounted to LE 4 million to improve the pumping of water in the region and the implementation of the water network of fishermen area at a cost of 700 thousand pounds. Their new water network has been implemented.
The head of the company pointed out that the replacement and renovation operations aimed at rehabilitating the networks to absorb the pumping of water over the 24 hours, where it is scheduled to eliminate the system of shifts in all regions.
Related topics
– Red Sea
Post a Comment