Deputy Governor of Giza and head of the Dokki district eye a cracked property on the street revolution
The deputy governor of Giza and the head of the Dokki district, the two properties No. 28 and No. 30 in Al-Thawra Street in the Dokki area, were examined shortly after they received a communication from the residents of the two properties that caused them to break up and parts of the building.
The men of the Dokki district and the civil protection men in Giza governorate moved to the location of the two properties, where a fracture was discovered in one aspect of the property due to the construction work on the land next to the Aqqarin, which led to a state of cracking and the fall of some parts of one side of the two properties.
The preliminary inspection of the Aqqarin by the senior engineer of Giza Governorate, which was summoned immediately, received the notification that the cracking condition was the result of the excavation and construction work on the adjacent plot of land. The decision was made to stop the excavation and construction work on the plot until a technical engineering committee The safety aspects of the construction aspects of the plot, in addition to a quick inspection by another engineering committee from the government to investigate the construction safety.
The district and district officials decided on the basis of preliminary inspection by the engineering committee to return the residents of the real estate to their units, after making sure that there is no danger to their lives from the cracking condition that hit the two properties, stressing that what happened in the property is just a small part of one aspect of the property due to Drilling with the neighboring land will not affect in one way or another the safety of the poor or the lives of its inhabitants.
Post a Comment