Header Ads

In response to the "seventh day" .. Elimination of the Bank of the sea Zefta of waste in Mahalla .. Photos

News Provinces

In a quick response to the publication of the "seventh day" entitled "Complaints of the blockage of the Bank of Zifta dumping garbage and dead animals," paid the drainage engineering west of Mahalla al-Kubra in the province of Gharbia, headed by Engineer Ahmed Zaky, director of engineering drainage West Mahalla, dredging to clean the bank and the accumulation of garbage , And dead animals from the bank, which caused the blockage of the bank and high water level.

On the instructions of Khalid Madin, head of the Egyptian General Authority for Drainage Projects, to make a periodic plan to clear all the banks and waterways belonging to the drainage authority, the waste was removed on the bridge of the bank until it was removed for disposal.

Ahmed Zaki, Director General of the West Bank of the Mahalla, said that there are 125 decisions to remove buildings erected in violation of the irrigation and drainage properties on the bank's bridge starting from Ezbet Shafiq, Azabat Rateb, Dahabheeliya and Ameriya. He said letters were sent to local units, To quickly lift the counters and all the facilities of the violating buildings until the implementation of the removal decisions, and carry out the clearing of the bank completely closed in front of these areas.

Disinfection of the marine waste bank in Mahalla (4)

Disinfection of the marine waste bank in Mahalla (13)

Disinfection of the marine waste bank in Mahalla (14)

Disinfection of the marine waste bank in Mahalla (21)

Disinfection of the marine waste bank in Mahalla (22)

Disinfection of the marine waste bank in Mahalla (25)

Related topics

. (tagsToTranslate) Egypt (t) Egypt News Today (t) News Western Province (t) Bank Zefta (t) Mahalla

ليست هناك تعليقات