Marks in the vicinity of Joseph Tito transformations

The General Directorate of Traffic in Cairo has stepped up the deployment of traffic services and signs in the vicinity of traffic diversions and a partial closure of the Joseph Tito axis to prevent traffic congestion during the construction of a bridge crossing bridge with the hub for a whole month..
At the end of Joseph Tito's axis, the traffic was carried out in front of the 81st military factory until the beginning of the circle. The next direction from Joseph Tito towards the ring was diverted to the other direction from the ring towards the artisans' bridge at Joseph Tito's axis."He said.
The direction of the movement at the end of the Joseph Tito axis before the ring road coming from the Craftsmen's Bridge closed the circular direction for 250 meters and for the other direction it is operated in two directions with the necessary separation of the movement isolates.
The partial closure of the "One Month" road is carried out, to close the route to the ring from the next of the Joseph Tito axis and the conversion to the 81 war factory to the other direction coming from the ring. The company executes the work "day and night"
Post a Comment