In response to "the seventh day" .. The Railway Authority ends the problem of drainage station Osirat
In a quick response from the railway authority for the publication of the site "the seventh day" under the title "after the development of 9 million pounds .. Railway station Osirat sink in sewage water .. Head of the Railway Authority: has been communicating with the Director of the Central Region .. The formation of A committee to inspect the station immediately, "the Commission, after communication with Engineer Shaaban Mahmoud, the director of the central region to remove and suction all stagnant water from waste disposal health Alasairat railway station and was working immediately and urgent maintenance of the drainage network after ensuring its safety.
The response came a few hours after the presentation of the problem to the engineer Ashraf Raslan, head of the railway, which issued direct instructions to officials in the central region to move immediately and deal with the problem and resolve.
For his part, Maree Ameen Ameer Al-Osairat Sports Club Fund thanked the rapid response and the suffering of the citizens residing near the railway station because of the problem of the sewage effluents in the station.
He also thanked the "Day Seven" Foundation, which adopted the subject and presented it to the officials. He pointed out that what was done by the "seventh day" indicates the social responsibility through the issues presented to the officials and received a quick response and immediate by them,.
It is noteworthy that the "seventh day" published an investigation on the railway station Osairat, which was developed and opened for 9 million pounds several years ago, but the sewage network has suffered significant problems affected the environment by the arrival of sewage to roads and neighboring houses.
(tt) Sohag (t) Egypt Railways (t) Esayrat Station (t) Head of Railway Authority
Post a Comment