صور .. 6 Information about كوبرى المراغة الجديد at a cost of 200 million .. Learn about it
In addition to the development projects being implemented in Sohag governorate, the political leadership is interested in the development and development of Upper Egypt after many decades of marginalization. The bridge comes after the project of the bridge of Gerga El Alawi, the bridge of Tahta El Alawi,.
The seventh day provides the most important information about Almaragh bridge after avoiding the obstacles that contradict the path of the bridge of the poles of lighting, gas lines, sewage and communication lines.
1. The project executing company is the Arab Contractors Company, an Egyptian joint stock company.
2. The bridge is about a kilometer long, running four ways, starting from Al Maragha irrigation north, ending with Al Maraghah electricity engineering in the south.
3- The total cost of the bridge is 200 million pounds, which can be increased.
4. The total length of the bridge between the first round and the second role and the two branches length of 2400 meters, and the width of the bridge from 8 meters to 10 meters.
5. The bridge passes the highest tahtawi canal and the railway westward.
6. The project contributes to the achievement of traffic liquidity and linking the east of the railway to its west, and reduce the accidents that result from the intersection of roads with the railway lines and the decomposition of traffic in front of the entrance Maragha, which is the main entrance to the villages located west of the railway in Al Maragha.
Bridge-anchorage- (9)
. (tagsToTranslate) Sohag (t) News Sohag (t) News Egypt (t) Bridge Almaragh (t) Projects Sohag
Post a Comment