Photos .. Remove the accumulations in front of bridge canal or Umm Jalajel in Dakahlia
Eng. Abdul Fattah El-Baz, Director General of East Dakahlia Irrigation, confirmed that the removal of the accumulations in front of a pipe bridge on the Umm El-Galajal Canal was completed by the irrigation of the Agha Irrigation Engineering, on the basis of the directives to prevent the presence of any grasses in the waterways that may obstruct the flow of water during the season Summer Crops.
It is noteworthy that the heads of bodies, departments and sectors in the ministry have been entrusted with continuous monitoring of water management and continuous traffic on the canal network As well as monitoring the condition of the bridges, equipment and pump stations and making sure they are ready, and the measures that have been taken to preserve our water resources from waste and unjust uses that are not earmarked within the Ministry plans to maintain them.
. (tagsToTranslate) Ministry of Irrigation (t) Governorate of Dakahlia (t) Canal Umm al-Jaljal (t) Water
Post a Comment